Recently Installed Modular in Aberdeen
AD Modular successfully installed 18 9.6m x 3m bays which consists of canteen, toilets, showers, first aid, stores & drying rooms for the site accommodation. We also installed 30 12m x 3m bays to provide the site with office accommodation where the internal has been reconfigured to the clients requirements.
For all site/office accommodation requirements, call our sales team now and discuss your options on 0800 5335360
Another Cabin On Hire From AD Modular
Our 32 x 10ft GRP cabins are on there way to our customer. The ground floor GRP consists of toilets and drink prep, the upper floor consists of an meeting room and open plan office.
We have also had our new van delivered, exciting!
Vinci Project – Nottingham
Taylor Woodrow Alstom Joint Venture at Nottingham (Vinci Project)
2000m² of Air Conditioned Office Accommodation. Refurbishment with provision of Air Conditioning to the Vinci owned building shown as Larch House. Not only could AD Modular supply the highest quality building to create the new offices in the extension, it could also provide a complete one-stop-shop solution by fitting out the offices with climate control, suspended ceilings and fire alarm. The buildings were handed over early May 2012 – on time and on budget, Duration of hire 2 years.
Modular School Accommodation Sale
When AD Modular were approached by Tuffin Ferraby Taylor and asked to supply a full turnkey package for a double classroom and changing room accommodation for Malden Parochial school in Kingston Upon Thames, we were advised that the project had to be completed within four weeks from design, manufacture and installation. This was due to another modular building company letting the school down at the last minute. The buildings were delivered and installed on pre-prepared groundworks in just a single day.
AD Modular stepped in and turned the project around working closely with the customer to ensure the building was delivered on time and to specification.
This project was handed over early October 2012, on time and budget.
What the client had to say:-
‘’In the circumstances of an existing contract to procure modular buildings falling through, AD Modular did a fantastic job of entering the project at a late stage in the programme, assisted in aiding the design and procured and erected two modular buildings ready for the school Autumn Term in September 2012. This was a superb effort given they were instructed at the beginning of August. The site operatives were extremely competent on site and communicative with members of the project team and the school . The end product was completed to an excellent standard with overall customer satisfaction very high.’’