Recently Installed Modular in Aberdeen

AD Modular successfully installed 18 9.6m x 3m bays which consists of canteen, toilets, showers, first aid, stores & drying rooms for the site accommodation. We also installed 30 12m x 3m bays to provide the site with office accommodation where the internal has been reconfigured to the clients requirements.

For all site/office accommodation requirements, call our sales team now and discuss your options on 0800 5335360

Liverpool University Modular Building

AD Modular were approached by Liverpool University to install, supply and design 10 modular bays double storey fully furbished for medical use including a stairway to enter into the premises. The building was approved by the National Health Service.

If we can help you with any accommodation requirement do not hesitate to give us a call on 0800 533 5360

Network Rail Staffordshire Alliance

AD Modular were asked to supply permanent offices in the form of modular buildings for Network Rail. The 28 double storey modular building was part of a £2.5 million project.

Assessment Ward

Southampton General Hospital was a project which was assigned to our crew by Kier Construction to design and install a 8no. bay modular, to be used as an assessment ward for the Southampton hospital which must meet all Building Regulations. The modular was to be placed within a tight courtyard within the hospital walls itself. This required our skilled team of builders to lift the modular over the existing buildings with a large crane and into the tight courtyard. Both Kier and Southampton General Hospital were thrilled with the final design and we are liaising with them as to a possible Accident & Emergency Building to be installed in 2015.

Our team design many buildings to measure and helped Southampton General hospital to measure precisely to fit perfectly into their courtyard so it could be used as a outdoor consultation building. Providing a large area for seating and consultation rooms, including a reception area to keep paperwork.

Our team of builders and design team will provide the very best service to make the building suitable for your requirements and tailored to accommodate special requirements.

Modular School Accommodation Sale

When AD Modular were approached by Tuffin Ferraby Taylor and asked to supply a full turnkey package for a double classroom and changing room accommodation for Malden Parochial school in Kingston Upon Thames, we were advised that the project had to be completed within four weeks from design, manufacture and installation. This was due to another modular building company letting the school down at the last minute. The buildings were delivered and installed on pre-prepared groundworks in just a single day.

AD Modular stepped in and turned the project around working closely with the customer to ensure the building was delivered on time and to specification.

This project was handed over early October 2012, on time and budget.

What the client had to say:-

‘’In the circumstances of an existing contract to procure modular buildings falling through, AD Modular did a fantastic job of entering the project at a late stage in the programme, assisted in aiding the design and procured and erected two modular buildings ready for the school Autumn Term in September 2012. This was a superb effort given they were instructed at the beginning of August. The site operatives were extremely competent on site and communicative with members of the project team and the school . The end product was completed to an excellent standard with overall customer satisfaction very high.’’