Category Archives: Case Studies

Proud sponsors of Team Parallel FreeFly Nationals Update

Parallel Freefly have achieved a silver medal at the UK National Championships 2017.

They have also qualified to represent GB at the 2018 World Championships in Australia.

Keep reading our news feed for updates, they also have a facebook page

https://www.facebook.com/parallelfreefly/

Proud sponsors of Team Parallel FreeFly 2017 Nationals

Parallel Freefly are showing their skills for the 2017 nationals. They have recently travelled to the Algarve to practice their routine.

They won a Bronze award Last year in the Nationals!!

Keep reading our news feed for updates, they also have a facebook page

https://www.facebook.com/parallelfreefly/

Recently Completed 36 bay Modular Building

AD Modular were approached to design a modular building to accommodate welfare and office accommodation in Uxbridge. The 36 bay modular building looks aesthetically pleasing both on the inside and the outside.

If we can help you with any accommodation requirement do not hesitate to give us a call on 0800 533 5360

Permanent Classroom Solution

The school were let down and left to cope with half a building when one of the ad Modular’s competitors went into administration halfway through the completion process.  ad Modular were asked to assist by the Council as we had provided them with modular accommodation at Malden Parochial School, which gave the school a great recommendation. ad Modular went in and rectified the works that had been carried out to a poor standard and then finished the remainder of the works for the School during the summer vacation period. Both the school and the Council were extremely happy with the work carried out.

 

The building was in need of some special requirements including a wheelchair ramp and shutter windows for security protection. This made the school more accessible to all and helped improve the reputation overall and helped provide disabled access in the school.

 

Assessment Ward

Southampton General Hospital was a project which was assigned to our crew by Kier Construction to design and install a 8no. bay modular, to be used as an assessment ward for the Southampton hospital which must meet all Building Regulations. The modular was to be placed within a tight courtyard within the hospital walls itself. This required our skilled team of builders to lift the modular over the existing buildings with a large crane and into the tight courtyard. Both Kier and Southampton General Hospital were thrilled with the final design and we are liaising with them as to a possible Accident & Emergency Building to be installed in 2015.

Our team design many buildings to measure and helped Southampton General hospital to measure precisely to fit perfectly into their courtyard so it could be used as a outdoor consultation building. Providing a large area for seating and consultation rooms, including a reception area to keep paperwork.

Our team of builders and design team will provide the very best service to make the building suitable for your requirements and tailored to accommodate special requirements.