Assessment Ward – Modular Building

Southampton General Hospital was a project which was assigned to our crew by Kier Construction to design and install a 8no. bay modular, to be used as an assessment ward for the Southampton hospital which must meet all Building Regulations. The modular was to be placed within a tight courtyard within the hospital walls itself. This required our skilled team of builders to lift the modular over the existing buildings with a large crane and into the tight courtyard. Both Kier and Southampton General Hospital were thrilled with the final design and we are liaising with them as to a possible Accident & Emergency Building to be installed in 2015.

Elevation drawing
Our team design many buildings to measure and helped Southampton General hospital to measure precisely to fit perfectly into their courtyard so it could be used as a outdoor consultation building. Providing a large area for seating and consultation rooms, including a reception area to keep paperwork.

Detailed design plan
Our team of builders and design team will provide the very best service to make the building suitable for your requirements and tailored to accommodate special requirements.

Modular Hire Site Accommodation

AD Modular were approached by Vinci Construction UK Limited and asked to supply 16no. sections of Double Storey Steel Plastisol Coated Modular Building for use as Offices, Canteen and Drying Room within the Vinci Construction compound on the prestigious Jaguar Land Rover site in Solihull, West Midlands.  As AD Modular had worked for Vinci Construction previously, we were appointed as Preferred Supplier and were requested to carry out a full turnkey package including delivery, installation, crane, electrical test to distribution board and water chlorination of water system.

AD Modular worked closely with Vinci Construction to ensure the building was delivered on time and to specification.

‘This project was handed over just before the Christmas break in December 2012, on time and budget’.

This has now helped Jaguar Land Rover develop and expand even more, and become one of the largest car companies in the United Kingdom.

Modular Hire Medical Centre

ad Modular were contacted by the Architect who had been let down with regard to a proposed medical centre facility.  This project had a very tight deadline which we needed to achieve without any compromise on quality.  Their requirement was for the full turnkey package including groundwork’s, foundations, service connections and landscaping.  All works including the buildings were to conform to Building Regulation Approval, for which we were to gain certification.

We also acted as Principal Contractor.

The building was to include consultation rooms, waiting area, toilets and offices.  Our Technical Team, together with the clients input, designed the requisite hygienic fixtures and fittings including curtain tracking around the beds, specialised sinks and flooring all of which needed to comply with HTM.  We also designed and installed a reception desk within the reception area.

AD Modular completed the contract within the required timescale and on budget, the medical staff and architect were over the moon with the completed project.

Vinci Project – Nottingham

Taylor Woodrow Alstom Joint Venture at Nottingham (Vinci Project)

2000m² of Air Conditioned Office Accommodation. Refurbishment with provision of Air Conditioning to the Vinci owned building shown as Larch House. Not only could AD Modular supply the highest quality building to create the new offices in the extension, it could also provide a complete one-stop-shop solution by fitting out the offices with climate control, suspended ceilings and fire alarm. The buildings were handed over early May 2012 – on time and on budget, Duration of hire 2 years.

[minti_testimonial author=”Jamie Missenden” company=”Vinci Construction” img=”15700″]“With reference to your recent works undertaken at Toton to establish our offices for the next  Phase of the Nottingham Tram I would like to commend you on your performance overall  but more specifically in relation to health, safety and the environment.During your works to install the building from the very beginning I have felt your attention to the required standards that we as a company set out has been of the highest quality. Your method statements and risk assessments were very good and the only amendments required were to ensure it fell in line with our procedures. In relation to the onsite works all operatives have understood the importance of the induction  process and the site rules laid out therein. Wherever an issue has been raised your site  management team has been very quick to react, rectify the situation and implement  measures to ensure there are no further such occurrences no matter how minor. In summary, I feel that the works have been undertaken to the highest levels of health and  safety with the environment considered at every turn. There is no doubt in my mind that I would highly recommend you to any other contractor in  all aspects of works and I thank you for your efforts on our project.”[/minti_testimonial]

Place Farm School – Suffolk

Place Farm School in Suffolk required two modular double classroom buildings while part of their existing school was being refurbished.  This project was completed on behalf of another modular building company. Working closely with one of our partner companies we ensured the building was delivered on time to a high standard.

The buildings provided a safe working environment for the children and staff who attended the school, and delivered an efficient service.